IPP
, Japan
Photo by J-Power.

How J-Power utilises digital technologies to enhance hydropower operations

One of the technologies includes the deployment of robots for inspection.

Electric Power Development (J-Power) leverages digital technologies in its hydropower plants to maintain their stable operation and enhance the work processes for its employees.

J-Power has tested various technologies at the Shimogo Power Station since 2019, with a special digital zone to strengthen operations at hydroelectric power plants

In a statement, the company said it developed the JPPredic system which aims to prevent equipment problems using artificial intelligence to detect equipment failures and notify the staff.

The system collects data from sensors on the turbine and other equipment, and stores them on a centralised management server.

ALSO READ: J-Power begins renovation work at Ogamigo Hydro project

It also advances the use of internet-of-things devices such as sensors on equipment, inspection tablets and surveillance cameras.

J-Power is also in the process of developing a new system that will allow remote support maintenance with the use of satellite broadband.

“This new system allows high-speed, high-capacity networks to be used even in deep mountainous regions where it is difficult to install optical fibres and where mobile phone signals do not reach,” it said.

In partnership with Blue Innovation Co., J-Power is developing and deploying robots that conduct inspections within and around power plants. The robot can function even during emergencies such as disasters which helps in optimising inspections.

Follow the link for more news on

Jaringan listrik lemah Vietnam menghambat kebijakan pembelian listrik yang langsung

Infrastruktur energi yang buruk menghambat integrasi kapasitas baru dari proyek energi terbarukan (EBT).

Penutupan pembangkit listrik batu bara baru di ASEAN pada 2040 mungkin tercapai

Penambahan pembangkit batu bara baru dan retrofit pembangkit yang ada menjadi risiko lebih besar dalam transisi.

ADB menyetujui pinjaman senilai $500 juta untuk mendukung transisi energi Indonesia

Ini bertujuan membangun kerangka kebijakan yang kokoh dalam mendukung peralihan menuju energi bersih.

Avaada meningkatkan beban energi terbarukan untuk penuhi permintaan pusat data India

Perusahaan menargetkan kapasitas energi terbarukan sebesar 30 gigawatt pada 2030.

Asia-Pasifik mungkin tidak mencapai target energi terbarukan

Negara-negara di kawasan itu harus menarik investasi untuk memajukan tujuan energi bersih mereka.

Laba bersih Adaro turun 12% menjadi $880 juta di Semester 1

Pendapatan turun 15% menjadi $2,97 miliar pada periode tersebut.

ACEN dan Barito Renewables bermitra untuk mempercepat energi angin di Indonesia

Kemitraan ini akan dijalankan oleh anak perusahaan mereka.

Malaysia diminta mengintegrasikan jaringan listrik untuk mempercepat pertumbuhan tenaga surya

Pembatasan penetrasi tenaga surya ke jaringan pada 24% dari permintaan puncak dapat menghambat ekspansi.