How to deliver stakeholder confidence

By Robin Pickup

A scenario:
• You identify an attractive investment opportunity that requires its assets to perform safely and reliably .
• You will be the subject of severe reputation and financial penalties should the plant fail to perform as contracted.
• Your main contractor is fine on deliver but is stating they have some 400 global suppliers to whom they will subcontract equipment orders.
• Safe and reliable delivery of the equipment is essential .Failure would have unacceptable negative impact on your brand and financial return.
• You have substantial uncertainty ,substantial risk and hard questioning from your stakeholders

How do you mitigate the uncertainty and lower the risk to retain the investments attractiveness to you and your stakeholder ? “Have we thoroughly evaluated all of our exposure to risk ?

Evaluation is done by answering :
• What can go wrong?
• How likely is it to go wrong?
• How bad can it get if it does go wrong?
• Do I need to worry about it?
• What are my options to protect myself?
• What is my last course of action?

A basic fact: In any unplanned stoppage or failure to meet a schedule or when an accident occurs , at least one the above will not have been addressed adequately.
Risk mitigation and hence reducing uncertainty is no more than asking the above questions, agreeing the answers and then applying them as actions.

To add real value to the vendor selection process and promote the collaboration between buyer and seller it is suggested industry looks to develop an SMART inspection vendor risk rating and assessment scheme to assist buyers evaluate their vendors against benchmarked leading practice, understand and articulate were intervention is needed and also to give vendors a tool to target for improvement their own internal weaknesses thereby minimising risk and reducing uncertainty, improving reliability, safety and hence business performance

SMART inspection is based on 3 models:
Equipment criticality ratings (Consequence modelling)
Vendor risk assessment
SMART tailored Inspection Test Plans
(mitigating the risks identified in the equipment and vendor assessments)

Conclusion. Using a SMART inspection tool buyers are working with vendors to assure the buyer gets what they want and the vendor can identify were they may be weak in delivering to the buyer and work with them to mitigate/correct the weakness.

Follow the link for more news on

Jaringan listrik lemah Vietnam menghambat kebijakan pembelian listrik yang langsung

Infrastruktur energi yang buruk menghambat integrasi kapasitas baru dari proyek energi terbarukan (EBT).

Penutupan pembangkit listrik batu bara baru di ASEAN pada 2040 mungkin tercapai

Penambahan pembangkit batu bara baru dan retrofit pembangkit yang ada menjadi risiko lebih besar dalam transisi.

ADB menyetujui pinjaman senilai $500 juta untuk mendukung transisi energi Indonesia

Ini bertujuan membangun kerangka kebijakan yang kokoh dalam mendukung peralihan menuju energi bersih.

Avaada meningkatkan beban energi terbarukan untuk penuhi permintaan pusat data India

Perusahaan menargetkan kapasitas energi terbarukan sebesar 30 gigawatt pada 2030.

Asia-Pasifik mungkin tidak mencapai target energi terbarukan

Negara-negara di kawasan itu harus menarik investasi untuk memajukan tujuan energi bersih mereka.

Laba bersih Adaro turun 12% menjadi $880 juta di Semester 1

Pendapatan turun 15% menjadi $2,97 miliar pada periode tersebut.

ACEN dan Barito Renewables bermitra untuk mempercepat energi angin di Indonesia

Kemitraan ini akan dijalankan oleh anak perusahaan mereka.

Malaysia diminta mengintegrasikan jaringan listrik untuk mempercepat pertumbuhan tenaga surya

Pembatasan penetrasi tenaga surya ke jaringan pada 24% dari permintaan puncak dapat menghambat ekspansi.